• 242 New Hope Dr, Spartanburg, SC 29303

For Sale

Industrial

For Sale

This property is available for sale
12.81
Acres
Negotiable
Sale Price
  • Total Building Size
    310,960 RSF
  • Overview

    The second phase of proposed industrial development at Spartan Exchange is now available for build-to-suit offers. This ±65-acre site is situated behind the fully leased Spartan Exchange Phase I building on Tyger Lake Rd.
    Master plans show potential for multiple development scenarios and up to two buildings at this location: Proposed Building A (247,000 SF) and Proposed Building B (310,960 SF).
    The developer, SunCap, proposes Class A concrete tilt-wall facilities with rear-load orientation.


    Industrial users at this location are able to take advantage of extremely close proximity to I-85 (less than one half mile), with all-right turns leading straight to both the northbound and southbound on-ramps at Exit 66.Norfolk Southern Rail line borders this property to the north, with potential for direct access terminal. Nearby corporate neighbors include Leigh Fibers, XPO Logistics, Gibbs International, Firestone, Pacorini, Adidas and FedEx Freight.


    At approximately 10 miles to BMW Plant Spartanburg, this property meets BMW's "just-in-time, just'in-sequence" requirement and is also ±10 miles from the logistics hub surrounding the Inland Port in Greer, SC. All utilities are available on-site with minimal impediments to development.


    Please contact the industrial brokerage team in Spartanburg for more information about this property.

    2 Proposed Buildings
    Access via New Hope Rd (all right turns to I-85)
    ±3 miles to I-26
    ±10 miles to SC Inland Port
    Meets "just-in-time, just-in-sequence" requirements for BMW
    All utilities on-site
    Norfolk Southern rail access to the north

Contact or Call

For Lease

Industrial

Industrial Space

Available now!
310,960
Square feet
  • Time on Market
    about 3 years
  • Space ID
    2043079
  • Overview

    The second phase of proposed industrial development at Spartan Exchange is now available for build-to-suit offers. This ±65-acre site is situated behind the fully leased Spartan Exchange Phase I building on Tyger Lake Rd.
    Master plans show potential for multiple development scenarios and up to two buildings at this location: Proposed Building A (247,000 SF) and Proposed Building B (310,960 SF).
    The developer, SunCap, proposes Class A concrete tilt-wall facilities with rear-load orientation.


    Industrial users at this location are able to take advantage of extremely close proximity to I-85 (less than one half mile), with all-right turns leading straight to both the northbound and southbound on-ramps at Exit 66.Norfolk Southern Rail line borders this property to the north, with potential for direct access terminal. Nearby corporate neighbors include Leigh Fibers, XPO Logistics, Gibbs International, Firestone, Pacorini, Adidas and FedEx Freight.


    At approximately 10 miles to BMW Plant Spartanburg, this property meets BMW's "just-in-time, just'in-sequence" requirement and is also ±10 miles from the logistics hub surrounding the Inland Port in Greer, SC. All utilities are available on-site with minimal impediments to development.


    Please contact the industrial brokerage team in Spartanburg for more information about this property.

    2 Proposed Buildings
    Access via New Hope Rd (all right turns to I-85)
    ±3 miles to I-26
    ±10 miles to SC Inland Port
    Meets "just-in-time, just-in-sequence" requirements for BMW
    All utilities on-site
    Norfolk Southern rail access to the north

  • Presented By
    Colliers | Spartanburg
    Garrett Scott
    John Montgomery
    Colliers | Greenville
    Brockton Hall
Contact or Call

Property Details

Spartan Exchange Phase II Build-to-Suit Site

The second phase of proposed industrial development at Spartan Exchange is now available for build-to-suit offers. This ±65-acre site is situated behind the fully leased Spartan Exchange Phase I building on Tyger Lake Rd.
Master plans show potential for multiple development scenarios and up to two buildings at this location: Proposed Building A (247,000 SF) and Proposed Building B (310,960 SF).
The developer, SunCap, proposes Class A concrete tilt-wall facilities with rear-load orientation.


Industrial users at this location are able to take advantage of extremely close proximity to I-85 (less than one half mile), with all-right turns leading straight to both the northbound and southbound on-ramps at Exit 66.Norfolk Southern Rail line borders this property to the north, with potential for direct access terminal. Nearby corporate neighbors include Leigh Fibers, XPO Logistics, Gibbs International, Firestone, Pacorini, Adidas and FedEx Freight.


At approximately 10 miles to BMW Plant Spartanburg, this property meets BMW's "just-in-time, just'in-sequence" requirement and is also ±10 miles from the logistics hub surrounding the Inland Port in Greer, SC. All utilities are available on-site with minimal impediments to development.


Please contact the industrial brokerage team in Spartanburg for more information about this property.

2 Proposed Buildings
Access via New Hope Rd (all right turns to I-85)
±3 miles to I-26
±10 miles to SC Inland Port
Meets "just-in-time, just-in-sequence" requirements for BMW
All utilities on-site
Norfolk Southern rail access to the north

  • Property Type
    Industrial
  • Total Building Size
    310,960RSF
  • Total Acres
    12.81
  • Total Available
    310,960RSF
  • Largest Contiguous
    310,960RSF
  • Building Class
    A
  • Property ID
    2179671

Landlord's Leasing/Sales Representatives

  • Garrett Scott
    Colliers | Spartanburg
     
  • John Montgomery
    Colliers | Spartanburg
     
  • Brockton Hall
    Colliers | Greenville