For Sale
For Sale
-
Total Building Size
310,960 RSF
-
Overview
The second phase of proposed industrial development at Spartan Exchange is now available for build-to-suit offers. This ±65-acre site is situated behind the fully leased Spartan Exchange Phase I building on Tyger Lake Rd.
Master plans show potential for multiple development scenarios and up to two buildings at this location: Proposed Building A (247,000 SF) and Proposed Building B (310,960 SF).
The developer, SunCap, proposes Class A concrete tilt-wall facilities with rear-load orientation.Industrial users at this location are able to take advantage of extremely close proximity to I-85 (less than one half mile), with all-right turns leading straight to both the northbound and southbound on-ramps at Exit 66.Norfolk Southern Rail line borders this property to the north, with potential for direct access terminal. Nearby corporate neighbors include Leigh Fibers, XPO Logistics, Gibbs International, Firestone, Pacorini, Adidas and FedEx Freight.
At approximately 10 miles to BMW Plant Spartanburg, this property meets BMW's "just-in-time, just'in-sequence" requirement and is also ±10 miles from the logistics hub surrounding the Inland Port in Greer, SC. All utilities are available on-site with minimal impediments to development.
Please contact the industrial brokerage team in Spartanburg for more information about this property.
2 Proposed Buildings
Access via New Hope Rd (all right turns to I-85)
±3 miles to I-26
±10 miles to SC Inland Port
Meets "just-in-time, just-in-sequence" requirements for BMW
All utilities on-site
Norfolk Southern rail access to the north
For Lease
Industrial Space
-
Time on Market
about 3 years
-
Space ID
2043079
-
Overview
The second phase of proposed industrial development at Spartan Exchange is now available for build-to-suit offers. This ±65-acre site is situated behind the fully leased Spartan Exchange Phase I building on Tyger Lake Rd.
Master plans show potential for multiple development scenarios and up to two buildings at this location: Proposed Building A (247,000 SF) and Proposed Building B (310,960 SF).
The developer, SunCap, proposes Class A concrete tilt-wall facilities with rear-load orientation.Industrial users at this location are able to take advantage of extremely close proximity to I-85 (less than one half mile), with all-right turns leading straight to both the northbound and southbound on-ramps at Exit 66.Norfolk Southern Rail line borders this property to the north, with potential for direct access terminal. Nearby corporate neighbors include Leigh Fibers, XPO Logistics, Gibbs International, Firestone, Pacorini, Adidas and FedEx Freight.
At approximately 10 miles to BMW Plant Spartanburg, this property meets BMW's "just-in-time, just'in-sequence" requirement and is also ±10 miles from the logistics hub surrounding the Inland Port in Greer, SC. All utilities are available on-site with minimal impediments to development.
Please contact the industrial brokerage team in Spartanburg for more information about this property.
2 Proposed Buildings
Access via New Hope Rd (all right turns to I-85)
±3 miles to I-26
±10 miles to SC Inland Port
Meets "just-in-time, just-in-sequence" requirements for BMW
All utilities on-site
Norfolk Southern rail access to the north
-
Presented By
Colliers | SpartanburgGarrett ScottJohn MontgomeryColliers | GreenvilleBrockton Hall
Property Details
Spartan Exchange Phase II Build-to-Suit Site
The second phase of proposed industrial development at Spartan Exchange is now available for build-to-suit offers. This ±65-acre site is situated behind the fully leased Spartan Exchange Phase I building on Tyger Lake Rd.
Master plans show potential for multiple development scenarios and up to two buildings at this location: Proposed Building A (247,000 SF) and Proposed Building B (310,960 SF).
The developer, SunCap, proposes Class A concrete tilt-wall facilities with rear-load orientation.
Industrial users at this location are able to take advantage of extremely close proximity to I-85 (less than one half mile), with all-right turns leading straight to both the northbound and southbound on-ramps at Exit 66.Norfolk Southern Rail line borders this property to the north, with potential for direct access terminal. Nearby corporate neighbors include Leigh Fibers, XPO Logistics, Gibbs International, Firestone, Pacorini, Adidas and FedEx Freight.
At approximately 10 miles to BMW Plant Spartanburg, this property meets BMW's "just-in-time, just'in-sequence" requirement and is also ±10 miles from the logistics hub surrounding the Inland Port in Greer, SC. All utilities are available on-site with minimal impediments to development.
Please contact the industrial brokerage team in Spartanburg for more information about this property.
2 Proposed Buildings
Access via New Hope Rd (all right turns to I-85)
±3 miles to I-26
±10 miles to SC Inland Port
Meets "just-in-time, just-in-sequence" requirements for BMW
All utilities on-site
Norfolk Southern rail access to the north
- Property TypeIndustrial
- Total Building Size310,960RSF
- Total Acres12.81
- Total Available310,960RSF
- Largest Contiguous310,960RSF
- Building ClassA
- Property ID2179671